Achilles Sailing Yachts built by Butler Mouldings

Any comments please to:

WebMaster: Norman Anthony norman@achillesyachts.co.uk © 2009

Version24 Last updated1/9/10

Flickr Index

News

Yacht types

For details of Chris Butler and Butler Mouldings

For Sale/Wanted

Home Page

Related Sites

Previous

Next

Achilles 24 Zethar Cabin Refit

Part 5

Glueing the headlining was as fiddly and time consuming as expected. Each section was cut using the old pieces as patterns but allowing an edge for trimming and fitting except where the pieces fitted hard under the shelves. There an exact line was cut from the old pieces so that we could glue along under the shelves and use that as a datum for alignment and when it came to glueing this idea worked well. The forecabin was done first and the deckhead was the most difficult.



In the concave curves under the forehatch bubbles kept appearing so we had to shore it up with whatever we could find. After being left overnight the bubbles were gone and the vinyl was well stuck.



Below shows one of the last big pieces to go on. At this stage it has been glued along under the shelf the next stage is to with the glue to start coating the rest of the hull down to the ridge where the cabin moulding is glassed to the hull.